This was the beginning of this adventure, all the tools are there to work but not a lot of polish to the space. After some work on framing and subfloor. Not ideal to work around the studio area but both jobs had to get done while finishing up customer jobs. Getting very close at this point, the walls complete and painted, the flooring in and awaiting window casings and baseboards. Some very good lighting installed, as there is never enough quality light to paint by. After this point it will be the new cabinets and storage areas, followed by setting up the studio once again.